Deteriorated H2 Bushing in a 200 MVA Auto Transformer

In this scenario, offline PF tests on a 230/138 kV, 200 MVA auto transformer revealed a “deteriorated” H2 bushing, with PF rising from 0.26% to 0.87% over two years—exceeding industry thresholds for replacement. The transformer supplied a mountain resort where the secondary source couldn’t meet summer/winter peak demands, risking extended outages if failure occurred. 

ZTZ’s Technical Expertise

ZTZ recommended leveraging their continuous BMS to “ride out” the 16-18 week bushing delivery delay. Their expertise involved analyzing temperature-dependent PF trends, which showed higher PF at elevated summer temperatures (up to ~0.8% PF), indicating ongoing but non-catastrophic deterioration. This allowed safe re-energization while monitoring for escalation. 

Evidence of Monitoring Use

The BMS tracked PF in real-time via test tap signals, providing confidence to de-energize only if trends worsened (e.g., the chart showed PF fluctuations tied to temperature, peaking at 0.8% in summer). Post-replacement during a scheduled outage (no customer interruption), all bushings stabilized below 0.5% PF deviation, confirming the system’s accuracy in minimizing outage risk. 

Additional Case Studies

Ready to protect your infrastructure?

Let’s discuss transformer monitoring solutions tailored to your specific needs and infrastructure. Contact us now and talk to an American engineer at our company.